
Opinion
AI’s next bottleneck is electricity, not chips
The AI infrastructure race is becoming a power-and-grid race, as AMD’s 2.5 GW agreement and a proposed $100 billion data-center campus show. That favors electrical equipment, engineering, storage, and reliable generation over the latest chip headline alone.
Aug 8, 20265 MIN